Eenglish-tests.com

C1 British · Dialogue 1

Dividing Up the Project

Two A-level students plan a geography project on urban heat and agree on who does what, and when.

24 lines · Tap a line to hear it again

Dialogue

Z

Zara:Right, before we get distracted again, can we sort out who's doing what? Mr Okafor wants the whole project in twelve days, and I've already got two essays due this week.

R

Rhys:Fine by me. I've been thinking about it, actually. I'd like to take on the data collection. The department's got those little temperature sensors, and I reckon we could put them on twenty streets around the town centre.

Z

Zara:Twenty? That's ambitious. How long would that take?

R

Rhys:If I cycle round, a morning to set them up and another to collect them. They record the temperature every ten minutes, so we'd get three full days of readings.

Z

Zara:OK, that actually sounds brilliant. My only worry is, and please don't take this the wrong way…

R

Rhys:Go on, say it. You think I'll leave it until the last minute.

Z

Zara:Well, last term you started the river report the night before it was due. I ended up rewriting half the conclusion at seven in the morning.

R

Rhys:That's fair, I can't deny it. But this is different, because the sensors need time to run. I physically can't cram it into one night.

Z

Zara:Good point. So when would they go out?

R

Rhys:This Saturday. If they stay out until Tuesday, I can download everything on Wednesday.

Z

Zara:And while you're doing that, I'll write the introduction and the literature review. There's a study from Manchester showing that streets with trees can be up to four degrees cooler. That would make a great hypothesis to test.

R

Rhys:Nice. So we compare the leafy streets with the ones surrounded by concrete and car parks.

Z

Zara:Exactly. Then there's the analysis. Who's doing the graphs?

R

Rhys:You're much better with spreadsheets than I am. Could you do the graphs if I write up the methodology?

Z

Zara:Deal. But I want a proper timeline, written down and shared, so we can both see it.

R

Rhys:A calendar we can both edit? Fine. And why don't we meet here every Monday at lunchtime to check how far we've got?

Z

Zara:Every Monday. Even if there's nothing new to report.

R

Rhys:Even then. And if I fall behind, you're allowed to remind me as often as you like.

Z

Zara:I'll hold you to that. One more thing: what if it pours with rain all weekend? Wet sensors would skew the results.

R

Rhys:Then we need a back-up plan. I'll check the forecast on Friday, and if it looks wet, I'll put them out on Monday instead.

Z

Zara:That would only leave us about a week for everything else. That's tight.

R

Rhys:Tight but doable. And honestly, I'd rather have good data than rushed data.

Z

Zara:Agreed. I'll set up the calendar tonight and send you the link.

R

Rhys:And I'll book the sensors from the department before someone else grabs them.

Words in colour are explained in the glossary below.

Glossary

WordMeaning
sensors/ˈsensəz/small machines that measure things like heat or light
ambitious/æmˈbɪʃəs/needing a lot of work and difficult to achieve
cram/kræm/to try to do a lot of work in a very short time
literature review/ˈlɪtrətʃə rɪˌvjuː/a part of a project that describes what other people have already found
hypothesis/haɪˈpɒθəsɪs/an idea that you test to see if it is true
leafy/ˈliːfi/with a lot of trees and plants
methodology/ˌmeθəˈdɒlədʒi/a description of how you did your research
skew/skjuː/to change results so that they are not correct or fair
back-up plan/ˈbæk ʌp ˌplæn/a second plan you use if the first one fails
tight/taɪt/with very little time to spare

Tests

Found this text useful? Share it with a friend or your class.